樱花视频

Skip to main content

Table 4 Table of model summarye

From: Exploring the economic occupational health, safety, and fatal accidents in high-risk industries

Model

R

R Square

Adjusted R Square

Std. Error of the Estimate

Change Statistics

Durbin-Watson

R Square Change

F Change

df1

df2

Sig. F Change

NA (DCM, OP)

.969b

0.938

0.932

88518.553

0.015

4.681

1

19

0.043

1.105

DT (NA, GDP)

.994b

0.988

0.987

4564.149

0.038

61.557

1

19

0.000

0.758

NOP (OP)

.990a

0.981

0.980

1063.321

0.981

1020.510

1

20

0.000

1.325

OP (NOP, DBC)

.993b

0.986

0.984

909.428

0.005

6.273

1

19

0.022

1.654

GDP(PCDI)

.999a

0.999

0.999

13170.05821

0.999

15031.560

1

20

0.000

1.004

LF (DTI, OP, DBC)

.971c

0.942

0.933

465.00501

0.014

4.483

1

18

0.048

1.310

PCDI ( GDP)

.999a

0.999

0.999

400.78303

0.999

15031.560

1

20

0.000

1.001

DCM (NA, DBC)

.976b

0.952

0.947

568.093

0.029

11.287

1

19

0.003

1.427

DTI (DCM, LF, DBC)

.977c

0.955

0.948

4261.542

0.014

5.723

1

18

0.028

1.084

DBC (DTI)

.872a

0.761

0.749

119.996

0.761

63.655

1

20

0.000

1.761

  1. NA (DT, LF, OP, PCDI): Predictors: (Constant), DT, LF, OP, PCDI; Dependent Variable: NA